THIRD PARTY WORKS

Working within 50 meters of the railway boundary?

Working within 200 meters of a level crossing?

Working with the potential to cause ‘blocking back’?

Need advice? Contact our team

How can we help?

Our team will aid you with relevant information and requirements necessary to safeguard the railway while you conduct your operations.

Working near the railway poses significant risks to your staff, Translink employees, and the general public. 

We recognize these risks and are committed to working with you to mitigate them wherever possible to ensure the safe operation of trains, as well as the safety of passengers and workers.

Night scene at a railway underpass with workers using a crane to presumably perform maintenance or remove a tree blocking the tracks. Several people are present, and artificial lighting illuminates the area.

FURTHER INFORMATION ON TPW

As set out in the procedure, a third party may refer to the third party itself, the client, its agents, consultants, representatives, or contractors (including subcontractors). 

All Third Party Works shall be carried out in accordance with the NIR Third Party Works Procedure.

EXAMPLES OF TPW

Works team can help you with the requirements and potential solutions for various types of works/activities around the railway, including:

  • Construction or Building works

  • Cranes, Piling, MEWPS and lifting equipment

  • Utility works 

  • Bridge works including work at over or under bridges

  • Road / Footway, resurfacing and traffic management schemes 

  • Access onto the railway network

  • Works at Level Crossings

  • Domestic related projects (e.g. house extension & excavation works affecting slopes/retaining walls) 

  • Domestic maintenance (e.g. roof, scaffolding, building repair, maintenance, boundary works and Tree or vegetation management)

Private companies and Government Departments we have assisted

Talk to our team

The primary focus of our Third Party Works (TPW) team is to ensure safety and foster collaboration when conducting works near the railway. On Track Technicians can provide the planning, management and resources for any work within 50 meters of the railway boundary, within 200 meters of a level crossing, or in a location that could potentially cause a ‘line blockage’.

Our dedicated TPW team is here to support you throughout the process. We'll be sure to provide you with all the relevant information and requirements necessary to ensure the safety of the railway during your works.

The railway environment can be hazardous, and the actions or omissions related to Third Party Works can endanger your staff or the general public. We fully understand the risks involved and are committed to working with you to take care of these risks whenever possible. Our goal is to ensure the safe operation of trains, safeguard the well-being of passengers and workers, and minimise any potential hazards.

By working together, we can create a secure environment for all involved and maintain the smooth and safe functioning of the railway network. If you need any assistance or support, please don't hesitate to contact our team. We are here to help.